1. Overview of the Scottish Parliament Building

The Scottish Parliament Building is the home of the Scottish Parliament in Edinburgh, Scotland. The building was completed in 2004, after a lengthy construction process that was beset by controversy and cost overruns. The building is located at the foot of The Royal Mile, in the shadow of Edinburgh Castle.

The building was designed by Catalan architect Enric Miralles, who died before its completion. His widow, Benedetta Tagliabue, oversaw the completion of the project. The building has an unconventional design, with a number of asymmetrical features and curved walls. It has been praised for its innovative architecture, but has also been criticized for its high cost and controversial design.

2. Construction of the Scottish Parliament Building

Construction of the Scottish Parliament Building began in June 1999 and was completed in October 2004, at a cost of £414 million (US$ 635 million). The project was plagued by delays and cost overruns, which led to a public inquiry being established to investigate the causes of the problems.

The inquiry found that a number of factors had contributed to the problems, including poor management, lack of oversight, and unrealistic deadlines. The project was also hampered by the death of Miralles, who was unable to provide adequate supervision during construction.

Despite the problems, the Scottish Parliament Building is widely regarded as an architectural success. It has won numerous awards, including the European Union Prize for Contemporary Architecture and the RIBA Stirling Prize.

3. Controversy surrounding the Scottish Parliament Building

The Scottish Parliament Building has been embroiled in controversy since its inception. The most notable criticism has been directed at its cost and design. The building cost £414 million to construct, which is more than double the original estimate of £195 million. The cost overruns led to a public inquiry being established to investigate the causes of the problems.

The building’s design has also been controversial. Some have praised its innovative architecture, while others have criticized it as being too unconventional and difficult to navigate. There have also been concerns about the building’s environmental sustainability, as it is reported to use more energy than a traditional parliament building.

4. Cost of the Scottish Parliament Building

The cost of the Scottish Parliament Building has been a source of contention since its completion in 2004. The building cost £414 million to construct, which is more than double the original estimate of £195 million. The cost overruns led to a public inquiry being established to investigate the causes of the problems.

The inquiry found that a number of factors had contributed to the problems, including poor management, lack of oversight, and unrealistic deadlines. The project was also hampered by the death of Miralles, who was unable to provide adequate supervision during construction.

Despite the high cost, the Scottish Parliament Building is widely regarded as an architectural success. It has won numerous awards, including the European Union Prize for Contemporary Architecture and the RIBA Stirling Prize.

5. Design of сontroversial scottish parliament

The design of the Scottish Parliament Building has been controversial since its completion in 2004. Some have praised its innovative architecture, while others have criticized it as being too unconventional and difficult to navigate. There have also been concerns about the building’s environmental sustainability, as it is reported to use more energy than a traditional parliament building.

The building was designed by Catalan architect Enric Miralles, who died before its completion. His widow, Benedetta Tagliabue, oversaw the completion of the project. The building has an unconventional design, with a number of asymmetrical features and curved walls. It has been praised for its innovative architecture, but has also been criticized for its high cost and controversial design.

6. The architect of the Scottish Parliament Building

The Scottish Parliament Building was designed by Catalan architect Enric Miralles, who died before its completion. His widow, Benedetta Tagliabue, oversaw the completion of the project.

Miralles was a leading exponent of Catalan modernism, and his other notable projects include the Santa Caterina Market in Barcelona and the Hanover International Fairground in Germany. He died in 2000, aged 45, after suffering a brain hemorrhage.

7. The future of the Scottish Parliament Building

The Scottish Parliament Building is currently the home of the Scottish Parliament in Edinburgh, Scotland. The building was completed in 2004, after a lengthy construction process that was beset by controversy and cost overruns. The building is located at the foot of The Royal Mile, in the shadow of Edinburgh Castle.

The building was designed by Catalan architect Enric Miralles, who died before its completion. His widow, Benedetta Tagliabue, oversaw the completion of the project. The building has an unconventional design, with a number of asymmetrical features and curved walls. It has been praised for its innovative architecture, but has also been criticized for its high cost and controversial design.
There have been no plans announced for the future of the Scottish Parliament Building, but it is expected to remain the home of the Scottish Parliament for the foreseeable future.

FAQ

The original purpose of the Scottish Parliament Building was to be the home of the Scottish Parliament.

The cost of the project skyrocketed because of problems with the design, construction, and materials used.

It took ten years for construction to be completed.

The Scottish Parliamentary Corporate Body was responsible for overseeing the project.

There has been no evidence of corruption involved in the building of the parliament.

There have been several investigations into why the project failed so miserably, but no definitive conclusions have been reached.

Cite this assignment

Free Essay Samples (December 2, 2022) The Scottish Parliament Building: A History. Retrieved from https://essayholic.com/the-scottish-parliament-building-a-history/.
"The Scottish Parliament Building: A History." Free Essay Samples - December 2, 2022, https://essayholic.com/the-scottish-parliament-building-a-history/
Free Essay Samples June 28, 2022 The Scottish Parliament Building: A History., viewed December 2, 2022,<https://essayholic.com/the-scottish-parliament-building-a-history/>
Free Essay Samples - The Scottish Parliament Building: A History. [Internet]. [Accessed December 2, 2022]. Available from: https://essayholic.com/the-scottish-parliament-building-a-history/
"The Scottish Parliament Building: A History." Free Essay Samples - Accessed December 2, 2022. https://essayholic.com/the-scottish-parliament-building-a-history/
"The Scottish Parliament Building: A History." Free Essay Samples [Online]. Available: https://essayholic.com/the-scottish-parliament-building-a-history/. [Accessed: December 2, 2022]

More Related papers

Top